Vanwright Request a quote

Process

How a build runs

Five stages, twelve weeks in the workshop, and nothing to pay until the plan is on paper.

01

First call

About 1 week · Nothing to pay

We talk through how you travel, your van situation and a rough budget.

02

Plan on paper

About 2 weeks · Nothing to pay

We draw the floor plan to scale, list every part and send you a fixed quote.

GALLEY 2.2 M BENCH WARDROBE FRIDGE BED 1.4 × 1.9

03

Deposit and slot

About 2 weeks · Deposit: 25%

You pay the deposit, we book your slot and your van arrives at the workshop.

04

The build

12 weeks · Mid-build: 50%, due at week six

Insulation, wiring, water and joinery go in, in that order, with photos sent every Friday.

05

Handover

1 day · Handover: 25%

We walk you through every switch, tap and latch, then hand over the keys and a build sheet.

Next build slots

We keep three slots open at a time, so a build never waits on a bench.

Slot 1

March

Open. A deposit now holds this slot for a March start.

Slot 2

June

Open, and the usual choice for a van that still has to be found.

Slot 3

September

Open. Long enough away to plan a build around a family summer.

A quote holds a slot for two weeks. We’ll talk you through registration and compliance for your region.

Ready to talk it through?

Tell us how you travel and where you stop. We will come back with questions, not a brochure.

Request a quote