Process
How a build runs
Five stages, twelve weeks in the workshop, and nothing to pay until the plan is on paper.
01
First call
We talk through how you travel, your van situation and a rough budget.
02
Plan on paper
We draw the floor plan to scale, list every part and send you a fixed quote.
03
Deposit and slot
You pay the deposit, we book your slot and your van arrives at the workshop.
04
The build
Insulation, wiring, water and joinery go in, in that order, with photos sent every Friday.
05
Handover
We walk you through every switch, tap and latch, then hand over the keys and a build sheet.
Next build slots
We keep three slots open at a time, so a build never waits on a bench.
Slot 1
March
Open. A deposit now holds this slot for a March start.
Slot 2
June
Open, and the usual choice for a van that still has to be found.
Slot 3
September
Open. Long enough away to plan a build around a family summer.
A quote holds a slot for two weeks. We’ll talk you through registration and compliance for your region.
Ready to talk it through?
Tell us how you travel and where you stop. We will come back with questions, not a brochure.
Request a quote